Points of transition, where streams enter or leave the tower, are some of the most common and sever tower bottlenecks. Combining hydraulic evaluation with field data and gamma scan analysis is key to identifying and eliminating such bottlenecks.
To download the full version of this article please subscribe to our Technical Library.
Existing subscribers should login
Go Back