A discussion of the typical restraints encountered in FCC operation and the methods available to alleviate them, specifically through changes in operation or catalyst, or both - the objective being to increase the fresh feed to the FCC unit.
To download the full version of this article please subscribe to our Technical Library.
Existing subscribers should login
Go Back