Inbuilt design and operational safety practice in fluid catalytic cracking. Changes to FCC processing over time are described with examples of improvements. Safety instrumentation is discussed, along with the best way of operating the vapour line blind.
To download the full version of this article please subscribe to our Technical Library.
Existing subscribers should login
Go Back