Faulty equipment specifications sometimes carry unforeseen penalties, with loss of performance. But do not blame the original equipment manufacturer, say the authors – it is the process design engineer’s responsibility to meet the objectives
To download the full version of this article please subscribe to our Technical Library.
Existing subscribers should login
Go Back