It is a primary requirement of instrument change-over philosophy that all existing field control systems, safety systems and associated field instruments should remain fully operational and functional in their current configuration until new systems are fully installed, tested and and commissioned successfully. The existing field instruments and associated plant control and safety systems will be operating in parallel with the newly expanded facilities until commissioning is successfully completed. My question is that how parallel operation is possible and how the old system is decommissioned.