After replacement of Platformer Catalyst at our CCR-Platforming Unit, pressure of platformer feed at inlet of Packinox Combined Feed Exchanger increased from 6.0 kg/cm2 to 11 kg/cm2 within 2 months that is major constraint of 100% platformer load due to 100% opening of feed control valve & unit load is limited to 90%.
Recycle gas pressure is 5.3 kg/cm2 which is normal. It looks that there is plugging in spray bars due to migration of high dust of catalyst after start up.
Have anyone experience to solve this type of problem without shut down of platformer unit by changing some parameters like H2/HC ratio, plat unit load etc.We have maintained H/HC ration at 2.5 mole/mole.